Date | Project title | Location | Customer | Work and supply scope | |
2015.01 | No.3 Ultra clean emission FGD of Guangzhou Power Plant | Guangzhou | CASIC KAITIAN | Absorber and flue glass flake lining | |
2015.08 | Xian Xilian Power Plant FGD | Xian | Weilan Science and Technology | Absorber, flue, pit, trench site anticorrosion application | |
2015.08 | Xian Xijing Power Plant FGD | Xian | Weilan Science and Technology | Absorber, flue, pit, trench site anticorrosion application. | |
2015.08 | Jiutian Bio FGD | Shijiazhuang | Absorber, flue, pit, trench site anticorrosion application | ||
2015.09 | Ningbo zhengyuan Power Plant FGD | Xiangshan | Absorber, flue, pit, trench site anticorrosion application | ||
2015.09 | No.1&2 Unit FGD of Shanwei Power Plant | Shanwei | CEEC ENERGY HTPC | Absorber, flue, pit, trench site anticorrosion application | |
2015.11 | Xian Nanjiao Power Plant FGD stage 1 | Xian | Absorber, flue, pit, trench site anticorrosion application | ||
2015.12 | Sichuan Lutian Chemical ammonia FGD | Luzhou | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.01 | Shenmu Clean Energy Power Plant ammonia FGD | Shenmu | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.01 | Shanxi Future Energy ammonia FGD | Yulin | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.01 | Markor Chemical Coal machine integration ammonia FGD | Xinjiang | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.03 | Xian Textiles City Power Plant FGD | Xian | Weilan Science and Technology | Absorber, flue, pit, trench site anticorrosion application. | |
2016.03 | Xian Taihua Power Plant FGD | Xian | Weilan Science and Technology | Absorber, flue, pit, trench site anticorrosion application. | |
2016.03 | Hebei Chenxin Chemical FGD | Shijiazhuang | Absorber, flue, pit, trench site anticorrosion application | ||
2016.03 | China Datang Xiangtian Power Plant 2×600MW FGD | Xiantan | CASIC KAITIAN | Absorber, flue, tanks anticorrosion of glass flake and rubber | |
2016.03 | China Darang Linzhou Power Plant 2×350MW FGD | Linzhou | CASIC KAITIAN | Absorber, flue, tanks anticorrosion of glass flake and rubber | |
2016.03 | China Datang Jinzhushan Power Plant 2×600MW Unit FGD | Jinzhushan | CASIC KAITIAN | Absorber, flue, pit, trench site anticorrosion application | |
2016.04 | Xian Nanjiao Power Plant FGD stage 2 | Xian | 中国联合 | Absorber, flue, pit, trench site anticorrosion application | |
2016.04 | Yingde Bada Dust Precipitator & Denitration Equipment Anticorrosion Project | Yingde | CASIC KAITIAN | SCR Reactor glass flake lining | |
2016.05 | Shandong Hualu-Hengsheng ammonia FGD Stage 1 | Dezhou | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.05 | Hebei Changrun ST ammonia FGD | Gaoyang | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.05 | Datang Huayin Zhuzhou Power Plant #4 Unit Ultra low emission | Zhuzhou | SINOFINN | Absorber, flue, pit, trench site anticorrosion application | |
2016.06 | Shanxi Chemical Group FGD Project | Xian | Weilan Science and Technology | Absorber, flue, pit, trench site anticorrosion application | |
2016.07 | Shandong Hualu-Hengsheng ammonia FGD Stage 2 | Dezhou | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2016.08 | Guodian Yanji Power plant FGD | Yanji | CASIC KAITIAN | Absorber, flue, pit, trench site anticorrosion application | |
2016.09 | Guodian Harbin Power Plant FGD | Harbin | Longking EP | Wet electrostatic precipitator | |
2016.09 | Fufeng Famensi Power Plant FGD | Baoji | Weilan Science and Technology | Absorber, flue, pit, trench site anticorrosion application | |
2017.03 | Datang Keqi Chemical zone #2 Ultra Low Emission | Chifeng | JIANGNAN EP | Absorber, flue and tanks site anticorrosion application | |
2017.03 | Henan Coal gas Group 4#5#FGD | Zhumadian | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2017.04 | Inner Mongolia Xingan Berun Chemical ammonia FGD | Inner Mongolia | JIANGNAN EP | Absorber, flue, pit, trench site anticorrosion application | |
2017.04 | Shandong Xinxian Senyuan Ultra Low Emission Remodel Project | Liaocheng | Kehang EP | Absorber, flue, pit, trench site anticorrosion application | |
2017.05 | Yunlin Kaiyue Coal Chemical Ultra Low Emission Remodel Project | Yunlin | Kehang EP | Absorber, flue, pit, trench site anticorrosion application | |
Rubber lining pipe / Spray pipe: steel pipe fabrication and rubber sheet lining | |||||
2012.11 | Turkey 1×51MW POLAT Power Plant FGD | POLAT | Fedia EP | Piping and fitting lined rubber, rubber expansion joint | |
2011.11 | Russia Troitsk Power Plant 2×660MW Unit Generator FGD | Troitsk | Longking EP | Spray pipe rubber lining | |
2011.10 | Vietnam Power Plant FGD Elecrostatic Precipitator Project Nghi Son1 Thermal Power Plant 2×300MW | ASTIC | Spray pipe rubber lining | ||
2011.03 | CHD International Laizhou Power Plant Stage 12×1000MW FGD Project | Laizhou | Qingdao Huatuo | Spray pipe fabrication and rubber lining | |
2011.01 | CHD Weifang Power Plant#1-4 Unit Expand Production Package B | Weifang | Qingdao Huatuo | Spray pipe ϕ1220×12/4pcs fabrication and rubber lining | |
2010.07 | Weihai Botong Power Plant#4//5/6 Boiler FGD | Weihai | Datang | Spray pipe DN800×85004pcs fabrication and rubber lining | |
2010.06 | Datang Linzhou 2×330MW FGD | Linzhou | Datang | Spray pipe DN1000×12000 10pcs fabrication and lining | |
2010.05 | CHD Qudong Power Plant 2×330MW Unit Expand Production FGD | Qudong | Qingdao Huatuo | Spray pipe DN900×11900 10pcs fabrication and lining | |
2010.05 | CHD Zibo Power Plant 2×330MW Unit Expand Production FGD | Zibo | Qingdao Huatuo | Spray pipe DN900×11900 10pcs fabrication and lining | |
2010.03 | Taiyuan 2nd Power Plant #10-11Unit Expand Production Project | Taiyan | Datang | Spray pipe DN800×10600 16pcs fabrication and lining | |
Maintaining project in Chemical industry | |||||
2016.03 | BASF New Material Co. Maintaining Project | Pudong, Shanghai | BASF | Pump, Hydro-cylinder maintaining, pipe plugging | |
2016.06 | BASF PU Co. Equipment Maintaining Project | Caojing, Shanghai | BASF | Heater maintaining, flange remodeling,HCL gas equipment plugging | |
2016.08 | Covestro(former Bayer)Polymer (China) Co. Equipment Maintaining Project | Caojing, Shanghai | Covestro | Tank top maintaining, pipe plugging, flange remodeling | |